Othello-Maverick Telecom Tower Conditional Use Permit Public Hearing
Jun 21, 2024 at 10:00 AM
Shannon Morrelli of Rocky Mountain Towers submitted an application for a conditional use permit for a 150’ tall lattice tower for up to 4 telecommunication providers. The site is 1525 S. Industrial Ln, described as Lot 12, United Industrial Park, Parcel #1529030790012. Required permits are conditional use permit and building permit.
Public Hearing: The City of Othello Hearing Examiner will hold an online public hearing on the Conditional Use Permit Mon. June 10 at 10:00 AM Arrangements to reasonably accommodate special needs, including accessibility or an interpreter, will be made with 24-hour advance notice.
For additional information contact the City of Othello at 509-488-5686.
Public Hearing Meeting Link: https://us06web.zoom.us/j/83769201900?pwd=KzRlVFlkMDN2SmFQV091WkJYTWRkUT09
Meeting ID: 837 6920 1900
Passcode: 661753
One tap mobile
+12532158782,,83769201900#,,,,*661753# US (Tacoma)
- 1. Application Invoice Receipt.pdf
- 2. Narrative.pdf
- 3. Siting analyis and zoning compatibility.pdf
- 4. Zoning Drawings.pdf
- 5. Photo Sim.pdf
- 6. Lease.pdf
- 7. RF Justification.pdf
- 8. Surrounding Towers.pdf
- 9. Distance to residential.pdf
- 10. 1A Certification Letter.pdf
- 11. Towair Determination.pdf
- 12. FCC license.pdf
- 13. Height Analysis.pdf
- 14. Interference.pdf
- 15. Generators.pdf
- 16. Public Notice.pdf
- 17. Environmental Review.pdf
- 18. Comments.pdf
- 19. Previous versions.pdf
- 21. Updated Hearing Notice.pdf
- Industrial Lane cell tower CUP staff report. Updated.pdf